Uttar Pradesh Jal Vidyut Nigam Limited

A U.P. Government Enterprises

Sheetla Power House

Moth, District - Jhansi

Installed capacity - 3.6 MW (3x 1.2 MW)

No. of units - 3




Sailent Features

SL NO. DESCRIPTION DETAILS PROJECT
1. LOCATION
(i) State Performing the works of Sheetla SHP Moth, Jhansi Uttar Pradesh
(ii) District Jhansi
(iii) Taluke Moth
(iv) Village Bakuan/Reo
(v) Access  
  (a) By Road From Jhansi through Jhansi-Kanpur High Way 60 KM
and from Moth on Moth Bhander District highway 6 KM
2. CANAL FALL/LOW HEAD
(i) Project Utilized the following of fall on B.M.C. for power generation
Amargarh fall-at 23.92 km. 1.80 m
Bakuan fall at 25.762 Km.-2.41
Change in bed slope of B.M.C.
23.927 to 25.8 Km. -0.08
Gross head -4.29m
3. HYDROLOGY
(i) Design Discharge 123.0 cusec
(ii) Water availability From 1969 to 1996
 
4. LOW HEAD/CANAL SCHEME
a- Shape of Power Channel Trapezoidal NOtch Type Channel
b- Size B-25.6m, D-4.0m
c- Full Supply Level 185.815
d- Capacity of canal 123 cumecs
e- Lining Details Stone grouted Pitching
f- FallStarching B.M.C. Fall
g- Height of Fall 4.29m
h- By pas Arrangements Regulator with fish belly gates
i- Bridge if any On Power Channel
j- Annual closure period Power House 195 days
5. POWER HOUSE
(i) Type Surface
(ii) Head Maximum 6.95 m
Head Minimum 4.29 m
Head - Design 429 m
(iii) Size a-Length 40.90 m
  a- Width 21.40 m
b-Height 10.48 m
Machine Hall Floor Level 179.845 m
(iv) Installed Capacity 3600 K.W.
(v) Turbine Type Horizontal
Number 3
Capacity 1200 KW
(vi) Type of generator Synchronous
Power House Crane Lifting Capacity E.O.T. 16.00 Tonne
 
6. TAIL RACE
(i) Shape Trapezoidal
(ii) Size B-25.5, D-3.5
(iii) Length 0.100 KM
(iv) Water Level Maximum 181.52 m
Minimum 178.865
(v) No and size of Draft Tube 3 Nos
 
7. Power
(i) Installed Capacity 3.6 MW
(ii) Firm Power NIL
 
8. ANNUAL ENERGY K.W.
(i) Firm NIL
(ii) On 50% Dependable discharge 11.24 MU
(iii) On 75% 9.53 MU
 
9. SWITCYARD
(i) No of Bays 3
(ii) Size Rectangular
a- Length 40 m
b- Width 30 m
(iii) 33 K.V. Transmission Line 9 KM
10. ESTIMATED COST
(i) Total Cost
As per sanctioned by PIB Rs. 2099.00 Lacs
(ii) Cost per K.W Rs. 58300.00
(iii) Cost of Generation
On 50% dependable discharge Rs. 1.86/Unit
On 75% dependable discharge Rs. 2.22/Unit